African alluvial sand separator copper gold jig

Product Description                                                                                         &n

Featured Products

Product Description                                                                                          

African Alluvial Sand Separator Machine Copper Gold Jigger
African Alluvial Sand Separator Machine Copper Gold Jigger
 

Description OF African Alluvial Sand Separator Machine Copper Gold jigger

Hot Sale African gold separator machine operating recovery rate is higher than the sine wave by the sn: 3.01%, w: 5.5%, pb: 1.63%, zn: 2.04%; water consumption reduced by 30% -40%, covers reduction by 1/3, and the stroke is adjustable. The performance of Saw-tooth Wave Jig has reached the domestic advanced level, and is one of the ideal devices in energy-saving gravity separation. 


African Alluvial Sand Separator Machine Copper Gold Jigger





Working Principle                                                                                             


African Alluvial Sand Separator Machine Copper Gold jigger need water to work, and it loosens materials in vertical alternative water-flows, and it forms different layers of materials of different densities and discharges both layers from up and down discharging ports separately. The basic composition of jigger is jigging chambers, also called jigging boxes, and there are screens in each chamber.
Water and raw ore will be fed from one end of the jigger screen, the ore granules will move in the vertical alternative water-flows. Layers will be formed because of density difference of materials. The minerals with small density will be in the up layer and will flow together with the up pulp flow while material with bigger density will be in the down layer and will discharged from the down discharging port as jigging concentrate.

 


Product Application                                                                                         

African Alluvial Sand Separator Machine Copper Gold Jigger
African Alluvial Sand Separator Machine Copper Gold Jigger
Features OF African Alluvial Sand Separator Machine Copper Gold jigger:

- High capacity
- High concentration ratio and high recovery
- Fabricated with highest quality material
- Easy to install, operate and maintain
- The pulsation curve is saw-tooth wave shape facilitate heavy mineral to settling
- Saving water 30-40% than ordinary jig
- The pulsation speed very easy adjusted by regulator
- Suitable for roughing and desliming


African Alluvial Sand Separator Machine Copper Gold Jigger


Technical Data OF African Alluvial Sand Separator Machine Copper Gold jigger                                                      
ModelJig RoomStroke Coeffi
cient
SeptumInput Size
(mm)
Capacity
(t/h)
Water Consum
ption
(t/h)
Power
(kw)
Weight
(kg)
Area
(m2)
RawRoomTotal Area
(m2)
Stroke
(mm)
Times
(mm)
LTP -
34/2
0.135120.270.580-25320-
420
122-64-101.1800
LTA -
1010/2
1.0122.00.50-25250-
350
55-1510-202.22890
LTC -
69/2
0.54121.080.550-50220-
350
86-940-601.51420
2LTC-366/8T0.2-0.34282.160.68-
0.41
0-50120-
300
53-620-401.1x
2
3570
2LTC-6109/8T0.58-0.86285.760.52-
0.35
0-50120-
300
510-2080-1202.2x
2
4650
AM-300.644222.5740.470-501303010-15100-15032400



Our Company                                                                                           

African Alluvial Sand Separator Machine Copper Gold Jigger
 

 

 

--- PRE-SALE SERVICE ---

1.Based on clients' request and budget, GELIN experts will strictly make efficient, reliable solutions accordingly;

2.Mine sample testing is available, we welcome the customer send the sample to you for testing by courier, or, the customer take the sample to our factory for testing;

3. Design and provide the complete processing flowchart;

4. Design & manufacturer products according to clients' demands.

--- AFTER-SALE SERVICE ---

1.Pre-check and test the products before delivery;

2.Deliver the whole plant design for our clients which including infrastructure, electrical system and pipeline system design;

3.Trace the status of the shipping until the products received;

4.Prepare required documents to let clients pass custom clearance;

5.Dispatch experts to carry out below service on site:
1) Installation & debug of the machinery
2) Train the first-line operators & technical personnel

3) Carry out any other service clients may need

6. Provide technical exchanging & spare parts for life-long term

--- ONE STOP SOLUTION ---

1.Starting by running the mineral beneficiation experiment. To provide our clients with the best solution accordingly;

2.Besides supply the flowchart design & equipment, we also provide the infrastructure design; Electrical & pipeline system design, etc. To help our clients complete the design of the whole plant;

3.After the installation, debugging of the equipment, the official production will also be guiding by our experienced engineers on site, to guarantee the output minerals perfectly meet your demands.

FAQ                                                                                                             

Q: What Information should customers give to us in order to let we provide you with efficient & suitable quotation and assistance.

 A:1). What type is the mining? Is it rock stone? or it is sand?
    2). If rock stone,What is the general particle size(mm) of the raw ore?
    3). What is the handling capacity(tons per hour) you plan to work with?
    4).What is the elements of the raw ore? How much percent % of each minerals?

Q: Can we send the mineral samples to your company, let your company run the ore-dressing experiments test for us?

A: Yes, we can run the ore-dressing experiments for our customers. After the test, we will based on the results to give you the reasonable flowchart, suitable solution and equipments selection. etc.

Q: How long is the warrenty of your equipments? Does your company supply the spare parts?

AThe warranty period of Gelin equipments is one year. And of course we will supply the spare parts for you for life-long time at lowest cost.

Q: If i need the complete mineral processing line. is Gelin able to help us build it?

A: Yes, we can help you combine a complete mineral processing line. and give you related professional advices as long as you need.
There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service. 

           


Welcome to visit our factory in your free time!
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours